Production & Quality
Inspect, resolve and prevent quality problems
QMS covers inspections, SPC, nonconformities, corrective actions, audits and supplier quality. Failed checks and shop floor events open nonconformities automatically.
- In progressIN-2207Housing · Lot 5521
- PassedIN-2206Cover · Lot 5519
- PassedIN-2205Shaft · Lot 5517
- PassedIN-2204Bracket · Lot 5514
Opened from inspection IN-2207
- Why 1
- Burr on the edge
- Why 2
- Worn cutting tool
- Root cause
- No wear limit
An in-process inspection runs against an approved plan.
What it does
- 01
Nonconformities and CAPA
NCR and CAPA registers keep statuses and history. Closing an NCR or confirming a CAPA can require an e-signature.
- 02
Inspections and SPC
In-process and incoming inspections, SPC charts, MSA studies and AQL matrices cover measurement and sampling.
- 03
Complaints, audits and suppliers
Customer complaints get an 8D report. Audits follow templates and a yearly schedule. Suppliers get ratings and SCARs.
Where the data comes from
- Manual entry: registers, inspections, documents, audits and costs.
- MES events: SPC rule breaks, operator defects, scrap above a threshold and quality Andon calls.
- HSE, GEMBA, MES Service and Engineering add findings, inspections and released changes.
Good to know
- QMS has no report generator. Cyclical reports are built in Reporting.
- Calibration certificates are issued in CMMS. QMS shows the instruments.
- QMS covers one plant at a time. Each register shows the plant you work in.
Screens from the IRIS demo
Sample data from the IRIS demo factory. Click a screen to enlarge it.
Read more

How to Link Quality Issues to Production and MaintenanceLink every defect to its order, machine, shift, material lot and last work order, set rules for when quality calls in maintenance, and verify each fix.Read article · 7 min
How to Unify MES, WMS, QMS and CMMS Without Replacing EverythingUnify MES, WMS, QMS and CMMS without a big-bang project: shared master data first, then key events, and replace a system only when it blocks the flow.Read article · 7 min
Try QMS in IRIS
Start a 14-day trial on your plant's data, or open the interactive demo with sample data.